We're very busy right now, so replies to online enquiries may take a little longer. We're sorry for the wait and we'll reply as soon as we can. For anything urgent, please call the office on 01827 218833.

Package deal Solar + battery from £6,495 See the deals
Services
Products
Resources
Areas
AboutContact
NG1–NG17 · 337,098 population · Net-zero 2028

Solar Panels Nottingham: MCS Certified Installation Specialists

Solar panels in Nottingham make more sense than the weather suggests: PVGIS puts a south-facing panel in the city at about 970 kWh per kWp a year, so a typical 4 kWp roof makes around 3,880 kWh. Midland Solar designs and fits solar panels and battery storage across every NG postcode, from West Bridgford and Beeston to Arnold, Carlton and Hucknall, working from Tamworth, under an hour away. Nottingham City Council has also set a 2028 carbon-neutral target, earlier than most UK cities.

NG1–NG17
postcode area
337k
population
2028
council net-zero target
16+
years installing here

Nottingham housing stock and solar potential

Nottingham's housing covers every era: medieval and Tudor in the Lace Market (small numbers, often listed), Victorian terraces in the Meadows, Sneinton and Hyson Green, 1930s semis across Wollaton, Aspley, Sherwood, Mapperley, Carlton, and substantial post-war estates in Bilborough, Strelley, Bestwood. Beeston and West Bridgford (south of the Trent — Rushcliffe borough) have well-presented suburban detached and semi-detached. Long Eaton (NG10, in Derbyshire) is solar-friendly modern estates. Conservation areas include Park Estate and the Lace Market; see the planning notes below.

Nottingham climate and solar yield

PVGIS (the European Commission's solar model: SARAH3 data, panels facing due south at 35°, 14% system losses) gives central Nottingham about 970 kWh per kWp a year. Output peaks at about 3.8 kWh per kWp a day from May to July and falls to about 1.1 in December, so we size every system on the whole year, not on sunny days. The month-by-month table on this page shows what a 4 kWp roof makes.

Why solar in Nottingham in 2026

Nottingham City Council has set itself a target of becoming carbon neutral by 2028, earlier than most UK cities. For a household the practical points are national: domestic solar panels and batteries carry no VAT until 31 March 2027, the Smart Export Guarantee pays for what you send to the grid, and the city sits on National Grid Electricity Distribution's East Midlands network, which handles grid notifications and applications.

What solar costs in Nottingham

Nottingham 4kW domestic: £6,500-£8,800. 6kW: £8,500-£11,500. 8kW (larger NG12, NG10 detached and Beeston / West Bridgford detached): £11,500-£14,800. Battery add: £4,800-£8,500. Commercial 100-300kW on industrial parks (Lenton, Castle Marina, Nottingham Business Park, Beeston Business Park): £85,000-£250,000.

Nottingham grants and incentives

ECO4 runs until 31 December 2026. It is not a grant you claim: energy suppliers decide which measures to fund for qualifying low-income households, and you may be asked to contribute. Warm Homes: Local Grant is run by councils in England for owner-occupied and privately rented homes rated EPC D to G on a low income; ask Nottingham City Council, or your borough council if you live outside the city boundary, whether it is taking applications. Both are aimed at low-income households, so most homeowners fund solar themselves, and the zero VAT rate is the saving everyone gets. Export income comes from the Smart Export Guarantee: the better fixed rates were around 12p to 13p per kWh in October 2026.

Nottingham-specific install considerations

Park Estate (NG7) and the Lace Market (NG1) are conservation areas. Nottingham City Council asks for planning permission for panels on highly visible roof slopes in its conservation areas, which is stricter than the national rule, and New Lenton (Devonshire Promenade) and Strelley have Article 4 Directions. A listed building always needs planning permission and listed building consent. Most of Nottingham's suburban housing has straightforward access and installation.

Nottingham landmarks we work near

Nottingham Castle · Wollaton Hall · Trent Bridge Cricket Ground · Nottingham Forest (City Ground) · Theatre Royal · Sherwood Forest (nearby)

Frequently asked questions about solar in Nottingham

Is Nottingham really going carbon-neutral by 2028? ▼

That is the council's declared target, set in 2019 for the city's own emissions. For a household, the savings from solar come from your own roof and tariff, not from the target.

Do I need planning permission for solar panels in Nottingham? ▼

Usually not on a house: roof panels are permitted development if they stand no more than 0.2 m proud of the roof slope and no higher than the highest part of the roof. Nottingham City Council asks for permission on highly visible roof slopes in its conservation areas, New Lenton (Devonshire Promenade) and Strelley have Article 4 Directions, and a listed building always needs consent. Homes in West Bridgford, Beeston and Arnold are decided by Rushcliffe, Broxtowe and Gedling councils.

How much electricity do solar panels make in Nottingham? ▼

PVGIS gives about 970 kWh per kWp a year for a south-facing roof at 35°, so a 4 kWp system makes around 3,880 kWh: about 476 kWh in May and about 132 kWh in December. East and west roofs make less, and we model your own roof at survey.

Who connects a Nottingham solar system to the grid? ▼

National Grid Electricity Distribution runs the East Midlands network. A system up to 3.68 kW per phase is connected and the network told within 28 days (G98). Anything larger, including a battery that can export, needs a G99 application approved before connection.

Which Nottingham postcodes for solar? ▼

All NG1-NG17. Best suburban access: NG2 (West Bridgford), NG5 (Sherwood/Arnold), NG7 (suburban Wollaton), NG8 (Bilborough/Aspley), NG10 (Long Eaton), NG14 (Lowdham/Burton Joyce).

Ready for your Nottingham solar quote?

A local survey from a Nottingham-area engineer. Fixed-price MCS-compliant quote in 24 hours.

Planning Permission for Solar in Nottingham: Conservation Areas and Council Boundaries

For the great majority of Nottingham homes, rooftop solar is permitted development — no planning application needed. Nottingham City Council is the planning authority inside the city boundary, and its stance on domestic renewables is supportive, in line with its own carbon-neutral commitments. But Nottingham has 33 conservation areas, and that is where the detail matters. In conservation areas, permitted development rights do not cover panels installed on a wall that fronts a highway (GPDO 2015, Schedule 2, Part 14, Class A.1(c)) — but roof-mounted panels, including on a roof slope facing the road, generally remain permitted development subject to the standard conditions. Where an Article 4 direction applies, as in parts of Nottingham such as The Park Estate, those permitted development rights are removed and a full planning application is required. Three areas we get asked about most:

  • The Park Estate — laid out in the 1850s by architect T.C. Hine for the Duke of Newcastle, a conservation area since 1969, and still lit by around 226 working gas lamps. It is also a private estate, managed by Nottingham Park Estate Ltd under its own Act of Parliament, and many of its Victorian villas are listed. Solar here typically means listed building consent plus estate approval — achievable with careful panel placement on rear or concealed slopes, but not a job to start without a proper survey.
  • Mapperley Park and Alexandra Park (NG3) — an Edwardian suburb of detached and semi-detached villas with heavy mature tree cover. Conservation-area siting rules apply, and the tree canopy makes genuine shading analysis essential; the large, multi-slope roofs usually let us keep the array off the street elevation.
  • The Lace Market — 19th-century lace warehouses and townhouses in the city core, now mostly flats and businesses, where freeholder consent matters as much as planning.

One quirk that catches Nottingham homeowners out: the built-up area spans four planning authorities. West Bridgford answers to Rushcliffe Borough Council, Arnold and Carlton to Gedling Borough Council, and Beeston, Chilwell and Stapleford to Broxtowe Borough Council — only addresses within the city boundary deal with Nottingham City Council. It rarely changes whether you can install, but it decides whose rules and paperwork apply. We confirm your authority, conservation-area status and any listing as part of the free solar survey, so nothing surfaces after the scaffolding is booked.

Nottingham's Race to Carbon Neutral by 2028 — and What It Means for Your Roof

Nottingham declared a climate and ecological emergency in 2019 and set itself the most ambitious target of any UK city: carbon neutral by 2028, known locally as CN28. That is not just a slogan on a council report — it is visible on the city's rooftops:

  • The city council has put solar panels on more than 4,000 social housing properties since 2012, and secured a further £4.3 million of Green Homes Grant funding to fit panels to around 655 more — installations the council estimated would save each household roughly £240 a year.
  • At Trent Basin, part of the Waterside regeneration on the River Trent, the University of Nottingham-led Project SCENe pairs rooftop solar with a 2MWh community battery — billed as Europe's largest community battery when it was installed in 2018.
  • The city has run low-carbon energy infrastructure for decades: Enviroenergy's district heating network, founded in 1972 and the UK's most extensive municipal scheme, pipes heat from the Eastcroft waste-to-energy plant through roughly 68km of mains to around 5,000 homes and over 100 commercial buildings.

Two practical takeaways for homeowners. First, be clear about what those council schemes are: they cover social housing and grant-eligible households (via ECO4 and the Warm Homes Plan) — there is no general free-solar scheme for Nottingham owner-occupiers, whatever some adverts imply. Most households self-fund, helped by 0% VAT on domestic solar and battery storage until 31 March 2027. Second, all that activity means Nottingham is an easy city to install in: scaffolders know the housing stock, and National Grid Electricity Distribution — the East Midlands network operator, formerly Western Power Distribution — processes solar connection paperwork here routinely. If you want honest numbers for your own roof rather than a city-wide average, talk to us.

Serving Nottingham from Tamworth: Under an Hour Away, Every NG Postcode

Our base in Tamworth (B77) is 27.8 miles from Nottingham as the crow flies — about 39 road miles up the A42 and A453, typically 45 to 55 minutes' drive. That distance matters more than it sounds: it is close enough for survey slots at short notice (often same-week, same-day when the diary allows), for one team to handle your job from survey to commissioning, and for aftercare visits that do not depend on a national call centre. Midland Solar has been installing since 2009 and is MCS certified, NAPIT registered and a HIES member — the same accreditations apply whether the roof is in Tamworth or Top Valley.

We cover every Nottingham postcode district, and the roof conversation differs by area:

  • NG5 (Sherwood, Carrington) and NG7 (Forest Fields, Hyson Green, Lenton) — streets of Victorian and Edwardian red-brick terraces. Orientation is fixed by the street line, so the survey establishes which slope earns its keep; where the best slope faces the street in a conservation area, roof-mounted panels generally remain permitted development, and we confirm the position for your address before the design is fixed.
  • NG8 (Wollaton, Aspley, Bilborough) — the 1930s semis toward Wollaton often carry hipped roofs, which split the roof into smaller slopes. That shapes panel count and layout more than raw roof size does, and it is exactly the kind of thing a desktop quote gets wrong.
  • NG2 (West Bridgford), NG3 (Mapperley, Carlton), NG9 (Beeston, Chilwell, Stapleford, Toton) — fully covered, with the added detail that these fall under Rushcliffe, Gedling and Broxtowe councils respectively, which we handle as standard.

Solar Panels in Nottingham: Output Month by Month

These are PVGIS figures for a 4 kWp system facing due south at 35° in central Nottingham, with 14% system losses (SARAH3 data, read 18 November 2026). Your own roof will differ with direction, pitch and shading, but the shape of the year will not.

MonthkWh a day per kWp4 kWp system: kWh in the month
System sizeSystem sizeSystem size
January1.21150
February1.83205
March2.69334
April3.66439
May3.84476
June3.77452
July3.78468
August3.52436
September3.00360
October2.04253
November1.46175
December1.06132
Year2.663,880

Two things follow. The best summer months each make three to four times what December does, so a battery does most of its work from spring to autumn. And winter output is low but not zero: about 132 kWh in December from a 4 kWp roof.

What a 4 kWp System Costs and Earns in Nottingham

The government’s solar cost data for 2025/26 (DESNZ, MCS-certified installs) puts the average installed price of a domestic system up to 4 kW at about £1,955 per kW: roughly £7,800 for 4 kWp. Domestic solar panels and batteries carry no VAT until 31 March 2027.

Every unit your panels make and you use at home is a unit you do not buy from the grid at the GB average price cap rate of 26.32p per kWh (October to December 2026). Every unit you export earns your Smart Export Guarantee rate, and the better fixed rates were around 12p to 13p in October 2026. So 3,880 kWh a year is worth between about £470 (all of it exported at 12p) and about £1,020 (all of it used at home). Most homes land between the two; a battery, or running the washing machine and EV charging in daylight, moves you towards the top. We work out your own split from your usage at survey.

No obligation, no doorstep pressure — just a measured survey and a written design. Book your free Nottingham solar survey.

Package deal

Complete solar & battery packages

Fixed prices, supply and installation included. Every package is MCS certified and comes with our 2-year workmanship guarantee.

  • 3.84kW · 8 panels
    £6,495
    • 8 × LONGi 480W all-black
    • Fox ESS 3.68kW hybrid inverter
    • Fox ESS EP6 — 5.76kWh storage
  • 5.76kW · 12 panels
    £7,495
    • 12 × LONGi 480W all-black
    • Fox ESS 5.0kW hybrid inverter
    • Fox ESS EP6 — 5.76kWh storage
  • 7.68kW · 16 panels
    £8,495
    • 16 × LONGi 480W all-black
    • Fox ESS KH7 hybrid inverter
    • Fox ESS EP6 — 5.76kWh storage
See full package details

Upgrade any package to the Fox ESS EP12 (11.52kWh) for £995.

All package prices assume every panel fits on a single roof elevation. The price covers the cost of scaffolding to one elevation. If your roof needs scaffolding on more than one elevation, or has restricted access, that additional cost is quoted separately after survey. Prices include VAT. Domestic solar and battery storage is zero-rated for VAT until 31 March 2027. Subject to a free technical survey. We will confirm the final price in writing before any work is booked.