Package deal Solar + battery from £5,995 See the deals
Services
Products
Resources
Areas
AboutContact

How long does solar panel installation take?

Quick answer: Most residential installations are completed in just 1-2 days by our expert team.

Solar Panel Installation Timeline

One of the great advantages of solar is how quickly you can start generating your own electricity. Here's what to expect from the installation process.

Installation Day

The physical installation of solar panels typically takes 1-2 days for residential systems. Our experienced installers work efficiently to minimise disruption to your home.

Full Timeline

What Happens on Installation Day

Minimal Disruption

Our installers are respectful of your home and clean up thoroughly after work. You'll have full use of your home throughout the installation.

Still have questions?

Talk to a local MCS-certified installer — free, friendly, no pressure.

Ready for a free quote?

Free survey, fixed-price quote within 24 hours, no high-pressure sales.

Package deal

Complete solar & battery packages

Fixed prices, supply and installation included. Every package is MCS certified and comes with our 2-year workmanship guarantee.

  • 3.84kW · 8 panels
    £5,995
    • 8 × LONGi 480W all-black
    • Fox ESS 3.68kW hybrid inverter
    • Fox ESS EP6 — 5.76kWh storage
  • 5.76kW · 12 panels
    £6,995
    • 12 × LONGi 480W all-black
    • Fox ESS 5.0kW hybrid inverter
    • Fox ESS EP6 — 5.76kWh storage
  • 7.68kW · 16 panels
    £7,995
    • 16 × LONGi 480W all-black
    • Fox ESS KH7 hybrid inverter
    • Fox ESS EP6 — 5.76kWh storage
See full package details

Upgrade any package to the Fox ESS EP12 (11.52kWh) for £995.

All package prices assume every panel fits on a single roof elevation. The price covers the cost of scaffolding to one elevation. If your roof needs scaffolding on more than one elevation, or has restricted access, that additional cost is quoted separately after survey. Prices include VAT. Domestic solar and battery storage is zero-rated for VAT until 31 March 2027. Subject to a free technical survey. We will confirm the final price in writing before any work is booked.