Solar Panel Installation Process in Shepshed — Step by Step
Everything you need to know about getting solar panels installed at your Shepshed property — from your first survey and quote through DNO notification, scaffolding and fitting to final MCS commissioning. We guide you through every step.
Shepshed Installation Requirements
Grid Connection
Your Leicestershire property is covered by Western Power Distribution.
- ✓DNO notification handled by us
- ✓Typical response: 2-3 weeks
- ✓G98/G99 compliance included
Planning Permission
Most Shepshed homes don't need planning permission for solar panels.
- ✓Permitted development rights apply
- ✓Conservation areas: Market towns may require
- ✓We handle all compliance checks
Certifications
All Shepshed installations include full certification.
- ✓MCS certificate for SEG eligibility
- ✓Part P electrical certification
- ✓Building regulations sign-off
The Installation Process in Shepshed
Our streamlined 6-step process ensures your solar installation is completed efficiently with minimal disruption to your daily life.
Initial Consultation & Survey
Our MCS-certified surveyor visits your Shepshed property to assess your roof, shading, electrical system, and energy needs.
System Design & Quote
We design a bespoke solar system optimised for your property and provide a detailed, transparent quotation.
Paperwork & Permissions
We handle all necessary paperwork for your Shepshed installation, including DNO notification and any planning requirements.
Equipment Delivery
Premium solar panels, inverters, and all mounting equipment are delivered to your property ready for installation.
Installation Day
Our experienced team installs your complete solar system at your Shepshed home, typically completing in a single day.
Handover & Activation
We walk you through your new system, set up monitoring, and register you for the Smart Export Guarantee.
Preparing Your Shepshed Home for Solar Installation
A few simple preparations can help ensure a smooth installation day.
Clear Access
Ensure clear access to your loft space, fuse box, and any areas where work will be carried out. Move vehicles if needed for scaffolding.
Inform Neighbours
Let neighbours know about scaffolding and installation work. Our team works professionally and keeps disruption to a minimum.
Power Availability
Our team will need access to power for tools. Brief power interruptions may occur during connection work — usually under an hour.
Local Installation Considerations for Shepshed
Important regional information for your Leicestershire solar installation
Your Local DNO
Western Power Distribution (WPD) covers Shepshed. All G98/G99 applications are submitted by our team.
- ✓G98 notification for systems up to 16A per phase
- ✓G99 application for larger commercial systems
- ✓Typically 10 working days processing time
Leicestershire Solar Potential
Shepshed receives approximately 1,100-1,200 kWh/m² of solar irradiance annually, making it well-suited for solar panel installations.
A 4kW system in Shepshed typically generates 3,400-3,800 kWh per year.
Planning Permission in Shepshed
Most solar installations in Shepshed fall under permitted development rights, meaning no planning permission is required. However, certain conditions apply:
- ✓Panels must not protrude more than 200mm from the roof surface
- ✓Panels must not be higher than the highest part of the roof
- ✓Equipment should be removed when no longer needed
Planning May Be Required For:
- !Listed buildings in Shepshed
- !Properties in conservation areas
- !Ground-mounted systems over 9m²
- !Flats or maisonettes
We'll advise if planning permission is needed during your survey. Local authority: Leicestershire County Council.
Book Your Shepshed Survey
Responds in <2hrsCommon installation questions in Shepshed
How long does a solar panel installation take in Shepshed? ▼
Most Shepshed domestic installs are completed on site in 1–2 days. From signed quote to commissioning typically takes 3–4 weeks once DNO notification, scaffolding and MCS paperwork are factored in.
Do you handle the DNO notification and paperwork for Shepshed installs? ▼
Yes — we handle everything. Western Power Distribution covers Shepshed, and we submit the G98/G99 application, building-regs compliance and MCS registration on your behalf. You don't need to contact anyone.
When do I need scaffolding for my Shepshed installation? ▼
Scaffolding is erected the day before, or on the morning of, your fitting day and removed shortly after. It's required on almost all pitched-roof Shepshed installs for safe access and is included in your fixed quote.
How much disruption will the installation cause at my Shepshed home? ▼
Minimal. Our team works mainly on the roof and at your consumer unit. Expect brief power interruptions — usually under an hour — during the final connection. Most Shepshed homeowners carry on with their day as normal.
Do you sub-contract installations in Shepshed? ▼
No. Every Shepshed installation is carried out by our own MCS-certified engineers based in Tamworth — never sub-contracted. The team that surveys your roof is the team that fits your system.
Solar installation guides for areas near Shepshed
Ready to start your Shepshed installation?
A real local engineer visits your Shepshed property. Fixed-price, MCS-compliant quote within 5 working days — and we manage every step from survey to commissioning.