
Solar Basics
How Do Solar Panels Work? A Simple Guide
6 min read

Leicester receives approximately 1,400 sunshine hours annually, and electricity prices remain ~23% higher than pre-2022 levels. Combined with 0% APR finance options and the Smart Export Guarantee, payback periods for Leicester installations have dropped to 7–9 years.
Most Leicester installations qualify as permitted development. Listed buildings and conservation areas (New Walk, Highfields, parts of Stoneygate) require consent — we handle applications in-house.
Full detail in our Leicester costs 2026 breakdown:
Get a free no-obligation survey from our MCS certified local engineers. Most installations completed in a single day.